10 TRANSPORTATION
Mitsubishi Diesel Engine S12R OPERATION & MAINTENANCE MANUAL
176
Pub. No. 291Y1-40720 Revision: 5
• Devices and equipment outside the
scope of our supply are included in the
facility.
For the details, refer to such a
document as the specifications sheet
prepared by the generator supplier.
• For the devices and equipment outside
the scope of our supply. refer the
corresponding manual of the generator
and the supplier's operation manual.
1 Drain fuel, engine oil and coolant
from the engine.
2 Disconnect the wiring and pipings
from the engine.
3 Remove pipe covers and insulators
located near the hangers.
4 Hook the slings on the hangers.
• For the location of the hangers, refer
to "
ENGINE - OUTLINE" (→ Page 75).
5 Release the lockings between the
engine and the common bed.
6 Lift up the engine by using a crane
while checking the balance.
• Consider the engine's center of gravity to lift
the engine.
7 Slowly lower the engine on to a rack
for transport.
8 Fix the engine to a rack for transport.