English – 19
03. e - connect the mains power supply ca-
ble
e
CAUTION! - Before closing the cover, program the system as desired: Section 7
04. f - close the lid with its screw
g - hook up the control unit box
g
f
5
STARTING THE AUTOMATION AND CHECKING THE CONNECTIONS
5.1 - Hooking the automation up to the mains
CAUTION! – The automation must be hooked up to the mains by an expert electrician, in observance of established local regu-
lations.
Proceed as described below:
01. a - manually release the gearmotor, based on the model purchased
b - manually move the boom to about half way (45°)
c - manually lock the gearmotor
b
a c
WIDE S
WIDE M WIDE L
WIDE S
WIDE M WIDE L
45°
02. d - supply mains power to the automation
e - check that the OK LED starts ashing at regular intervals of about 1 ash per second
f - check that the LEDs relative to the inputs with NC type contacts are ON (all safety devices active) and the LEDs relative to the NO
contact inputs are OFF (no command present)
d
ON
15
14
13
12
111098765
f
LED OK
1234
5 6 7
8
9
10
LED NA
LED NC
LED FCC
LED FCA
24 V
l
FUSEFUSE
24 V
24 V
nm
24 V
24 V
180°
OFF
45°
LED FCC
LED FCA
LED FCC
LED FCA
ON
OFF