Fillcontrol Plus — 06.07.2016 - Rev. B English —
10.1 Maintenance schedule
The maintenance schedule is a summary of maintenance tasks to be carried out regularly.
▲ = Check, ■ = Service, ● = Clean
Check for leaks, see chapter 10.2 "Exterior leak test" on page 39 .
• Screw connections.
▲ ■
Annually
Check the makeup function, see chapter 7.5 "Function test" on page 25 .
▲
Annually
Check the system-specific setting values in the controller, see
chapter 9.2.1 "Customer menu" on page 34 .
• Mindestbetriebsdruck „P
0
“.
• "P
SV
" safety valve pressure.
▲
Annually
10.2 Exterior leak test
Check the following device components for leaks:
– "PU“ pumps and screw fittings.
• Seal any leaks at the connections or replace the connections, if required.
• Seal leaking screw connections or replace, if required.