Hardware Installation and Reference Guide System Commissioning
ii
4 System Commissioning
4.1 Startup Check
4.1.1 Checking Before the Device Is Powered On
The switch is well grounded.
The power cable is correctly connected.
The power supply voltage complies with the requirement of the switch.
4.1.2 Checking After Program Startup (Recommended)
After power-on, you are advised to perform the following checks to ensure the normal operation of follow-up configurations.
Check whether the status of the switch indicator is normal.
Check whether the service interface forwards data normally.