First Start-up 01.2000
6SE7087-6KP50 Siemens AG
3-2 Operating Instructions SIMOVERT MASTERDRIVES
AAA
Parameterizing by
download or with
parameter modules
See section
"Parameterization"
After checking the unit and the cabling once more,
power up the line voltage or DC bus voltage, if you have
not already done so, and perform a function test
according to your parameterization.
Function test
siehe
"Anschließen"
und "EMV-
gerechter
Aufbau"
It must be ensured that no danger for
persons and equipment can occur by
energizing the power and the unit. It is
recommended not to couple the driven
machine until the function test has
been successfully completed.
WARNING
Further start-up and parameterization according to
your specific requirements
siehe "Ans