Preparing for Operation
33
SIP ART PS2 Manual
A5E00074631-01
Preparing for Operation
This chapter describes all the preparations necessary for operating the
positioner.
3.1 Instrument identification (type key)
The order number of the positioner is printed on the rating plate and on
the packaging. Compare this with the order number in chapter 7.1,
page 105.
Installation of any modules required is described in chapter 2.5,
page 25 of this technical manual.
3.2 Dimensional drawings
11,2
23
50x4xM6
All air connections
G 1/4 or 1/4” NPT
9 deep
M8, 9 deep
182
58
72
29,5
29,5
3729
95
65
80
M20 x 1.5 or NPT-adapter
88,5
8
15
96,6
13,5
h9
1
14,5
7
38,5
Y1
E
60
33
Y1
PZ
Y2
2
7
48
Figure 3-1 Dimensional drawing version plastic housing 6DR5xx0
3