Contents
Disclaimers 1
Important Notice 1
Emission Compliance 2
Contents 3
Revision History 5
HANDLING AND SAFETY INSTRUCTIONS 6
Safety Symbols Information 6
IMPORTANTSAFETYINSTRUCTIONS 6
Chapter 1: Overview 10
The StorEdge Solution Components 10
Installation Equipment List 11
Inverter Transport and Storage 12
Chapter 2: Installing the Power Optimizers 13
Safety 13
Installation Guidelines 15
Step 1: Mounting the Power Optimizers 18
Step 2: Connecting a PV module to a Power Optimizer 18
Step 3: Connecting Power Optimizers in Strings 19
Step 4: Verifying Proper Power Optimizer Connection 20
Chapter 3: Installing the Inverter 21
Inverter Package Contents 21
Identifying the Inverter 21
Inverter Interfaces 22
Mounting the Inverter 26
Selecting a Residual Current Device (RCD) 28
Chapter 4: Installing the Battery 30
Chapter 5: Connecting the Inverter 31
Opening the Inverter Cover 31
Connecting the ACGrid 32
Connecting the Strings to the Inverter 33
Connecting the Energy Meter 34
Connecting the Battery 36
Closing the Inverter Cover 39
Chapter 6: Activating, Commissioning and Configuring the System 41
Step 1: Activating the Installation 41
Step 2: Commissioning and Configuring the Installation 42
Step 3: Verifying Proper Activation and Commissioning 44
Disclaimers 3
StorEdge Three Phase Inverter MAN-01-00648-1.3