26 EN
4. INSTALLATION
4.5.2.
The satellite reference station (A) is provided together with the charging base and is installed under the
protective cover (B).
It is powered by the charging base via a connector (C).
If the charging base (D) is not placed in an area where the sky is fully visible, the satellite reference station
(A) must be removed from the charging base and placed in an area where the sky is fully visible.
In this case, the installation of the satellite reference station (A) must be done using the fastening bracket
(E). To power the unit it is necessary to use a power supply, (F) that can be purchased separately as well
as a connection to an electrical outlet.
The separate point of installation of the reference station must be at a minimum height of 2.5 meters above
the ground.
Prepare the installation area of the power supply unit (F) in such a way to protect it from solar radiation as
well as to prevent it from being immersed in water under any weather conditions.