0703-001-700 Rev-C EN
www.stryker.com 39
2. If another available canister is not is use and has
sufficient capability to receive fluid, relocate the
manifold to the available canister (Figure 36).
Figure 36 – To Relocate the Manifold
3. If the 20-liter canister is full, shut down the rover for
docking. See Section 8.4.1 To Remove Disposable
Components and Section 8.4.2 To Shut Down and
Relocate the Rover. Dock the rover to empty the full
canister(s). See Section 8.4.3 To Dock the Rover.
0000160552, Rev. C Effective Date: Nov 25, 2015 1:43:15 PM
Print Date: Nov 25, 2015 02:19:13 PM