EasyManuals Logo
Home>Toshiba>Inverter>Tosvert VF-S15

Toshiba Tosvert VF-S15 Quick Start Manual

Toshiba Tosvert VF-S15
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
EN
4
E6581929
Mandatory
action
Turn the input power on only after attaching the terminal block cover.
When enclosed inside a cabinet and used with the terminal block cover removed,
always close the cabinet doors first and then turn the power on. If the power is turned
on with the terminal block cover or cabinet doors open may result in electric shock.
Make sure that operation signals are off before resetting the inverter after malfunction.
If the inverter is reset before turning off the operating signal, the motor may restart
suddenly, resulting in injury.
If incorrect setting, the drive may have some damage or unexpected movement. Be
sure to set the setup menu correctly.
Operations Caution
Prohibited
Observe all permissible operating ranges of motors and mechanical equipment.
(Refer to the motors instruction manual.) Not observing these ranges may result in
injury.
Mandatory
action
Use an inverter that conforms to the specifications of power supply and three-phase
induction motor being operated. If the inverter being used does not conform to those
specifications, not only will the three-phase induction motor not rotate correctly, but it
may cause serious accidents through overheating and fire.
The leakage current through the input/output power cables of inverter and
capacitance of motor may affect to peripheral devices.
The value of leakage current is increased under the condition of the PWM carrier
frequency and the length of the input/output power cables. In case the total cable
length (total of length between an inverter and motors) is more than 100m, overcurrent
trip may occur even the motor no-load current.
Make enough space among each phase cable or install the filter (MSF) as
countermeasure.
Maintenance and inspection Warning
Prohibited
Do not replace parts. This could be a cause of electric shock, fire and bodily injury. To
replace parts, call your Toshiba distributor.
Mandatory
action
The equipment must be inspected daily. If the equipment is not inspected and
maintained, errors and malfunctions may not be discovered and that could result in
accidents.
Before inspection, perform the following steps. ; (1) Turn off all input power to the
inverter. ; (2) Wait at least 15 minutes and check to make sure that the charge lamp is
no longer lit. ; and (3) Use a tester that can measure DC voltages (400V/800V DC or
more), and check that the voltage to the DC main circuits (across PA/+ - PC/-) is 45V
or less.
Performing an inspection without carrying out these steps first could lead to electric
shock.
Disposal Caution
Mandatory
action
If you dispose of the inverter, have it done by a specialist in industry waste disposal
(*). If you dispose of the inverter by yourself, this can result in explosion of capacitor or
produce noxious gases, resulting in injury.
(*) Persons who specialize in the processing of waste and known as “industrial waste
product collectors and transporters orindustrial waste disposal persons. Please
observe any applicable law, regulation, rule or ordinance for industrial waste disposal.
There are the following manuals at the back of the Japanese manual (Japanese model) in CD-ROM.
Refer to the manuals for safety function.
Safety function (STO) : E6581860 VF-S15 Safety function manual
ATEX : E6581861 VF-S15 ATEX Guide
II. Safety function
VF-S15_QS.indb 4VF-S15_QS.indb 4 2021/11/18 15:51:362021/11/18 15:51:36
EN
5
E6581929
1.3.2(1)_外側端子台カバーはずし方
slc_rev01_03.eps
MCCB
Please operate the inverter in the following procedure 1 to 6.
1. Check the purchase
Check that the inverter type is the same as your order.
4. Connect to the power supply and the motor (wiring)
(1) Connect to the terminal R, S and T(single phase: R and S) of the power supply.
2. Install the inverter
Power circuit terminal block
3. Remove the terminal block cover
Inverter main unit Name plate
Inverter Type
Power
supply
Motor
Grounding terminal
For EMC plate
Shorting-bar
* Remove the
shorting-bar
when using DC
reactor (DCL).
(2) Connect to the terminal
U, V and W of the motor.
* Ground must be
connected securely.
Rating label
Danger label
Inverter rated
output capacity
Power supply
Name plate
ex. VFS15S-2002PL
* For side-by-side installation,
refer to the instruction manual.
(1) Insert a screwdriver or
other thin object into the
hole indicated with the
mark.
(2) While pressing on the
screwdriver, rotate the
terminal cover downward to
remove it.
(3) Next, remove the inside
terminal block cover.
3 cm or more
Inverter
3 cm or more
5 cm or more
5 cm or more
Normal installation
VF-S15_QS.indb 5VF-S15_QS.indb 5 2021/11/18 15:51:362021/11/18 15:51:36
VF-S15_QS_CC2021.indd 5VF-S15_QS_CC2021.indd 5 2021/11/18 15:55:102021/11/18 15:55:10

Other manuals for Toshiba Tosvert VF-S15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toshiba Tosvert VF-S15 and is the answer not in the manual?

Toshiba Tosvert VF-S15 Specifications

General IconGeneral
BrandToshiba
ModelTosvert VF-S15
CategoryInverter
LanguageEnglish

Related product manuals