EasyManuals Logo
Home>Weishaupt>Burner>WG20 1-C Z-LN Series

Weishaupt WG20 1-C Z-LN Series User Manual

Weishaupt WG20 1-C Z-LN Series
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
Installation and operating instruction
Gas burner WG20…/1-C Z-LN
3 Product description
83054602 1/2020-01 La
14-96
3.3.4 Program sequence
Pre-purge
At heat demand, the actuator drives to full load position after the initialisation time
(TI) has elapsed.
The burner motor starts and the air pressure switch reacts.
The combustion chamber is pre-purged.
Ignition
Following the pre-purge phase(TV) the actuator drives to ignition position.
Ignition starts.
Fuel release
Following pre-ignition time (TVZ) valve1 opens and the gas pressure switch reacts.
Valve2 opens and releases the fuel.
Safety time
With fuel release, safety time (TS) and post-ignition time (TNZ) start.
The flame signal must be present within the safety time (TS).
Operation
The ionisation electrode monitors the flame.
The air damper actuator opens and closes depending on the regulator demand for
full load.
The residence time partial load (TVK) prevents cycling between partial and full load.
Post-purge
If there is no longer a heat demand, the solenoid valves close and stop the fuel
supply.
Post-purge time(TN) and valve proving begins [ch.3.3.2].
Following the post-purge time(TN) the burner motor switches off.
The air damper actuator drives to the Closed position.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Weishaupt WG20 1-C Z-LN Series and is the answer not in the manual?

Weishaupt WG20 1-C Z-LN Series Specifications

General IconGeneral
BrandWeishaupt
ModelWG20 1-C Z-LN Series
CategoryBurner
LanguageEnglish

Related product manuals