EasyManuals Logo
Home>ABB>Controller>i-bus EIB

ABB i-bus EIB User Manual

ABB i-bus EIB
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #250 background imageLoading...
Page #250 background image
ABB i-bus
®
KNX
Planning and application
248 2CDC508134D0202 | FCA/S 1.x.x.1
4.3.3 Control types
The following control types are commonly used for the control of valves in heating, air-conditioning and
ventilation applications.
Continuous control
Pulse width modulation (PWM)
Pulse width modulation calculation
4.3.3.1 Continuous control
With continuous control, a control value is calculated based, on the target temperature and the actual
temperature, and is used to optimally set the temperature. The valve is brought to a position, which
complies with the calculated control value. With this method the valve can be fully opened, fully closed and
even positioned in every intermediate position.
Continuous control is the most precise form of temperature control. At the same time, the positioning
frequency of the valve drive can be kept low. Continuous control can be implemented with the device for
electro-motor 3-point valve drives. This is implemented via a 1 byte control.
What is a 1 byte control?
For 1 byte control, a value of 0…255 (corresponds to 0%…100%) is preset by the room thermostat.
At 0 %, for example, the valve is closed and at 100% it is fully opened.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB i-bus EIB and is the answer not in the manual?

ABB i-bus EIB Specifications

General IconGeneral
BrandABB
Modeli-bus EIB
CategoryController
LanguageEnglish

Related product manuals