Planning to Use Your ControlNet PLC-5 Processor 2-5
The ControlNet system places your scheduled transfers in the first
part of each Network Update Interval (NUI). Time is automatically
reserved for network maintenance. Unscheduled transfers are
performed during the time remaining in the interval.
Unscheduled messaging on a ControlNet network is
non-deterministic. Your application and your configuration—number
of nodes, application program, NUT, amount of scheduled bandwidth
used, etc.—determine how much time there is for unscheduled
messaging.
Important: The ControlNet network reserves time for at least one
maximum-sized unscheduled transfer per NUI.
Depending on how much time there is for unscheduled
messaging, every node may not have a chance to send
unscheduled data every NUI.
You reserve a
specific amount
of time for all
scheduled
operations
Any time remaining is used
for unscheduled operations
The system
reserves time
for network
maintenance
One occurrence of the NUT is a NUI
. . .. . .
AB Drives

Table of Contents

Other manuals for Allen-Bradley ControlNet PLC-5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allen-Bradley ControlNet PLC-5 and is the answer not in the manual?

Allen-Bradley ControlNet PLC-5 Specifications

General IconGeneral
BrandAllen-Bradley
ModelControlNet PLC-5
CategoryController
LanguageEnglish

Related product manuals