2-1ASUS ROG Swift Pro PG248QP Series LCD Monitor
2.1 Assembling the monitor arm/base
1. Insert the base into the arm.
2. Fix the base to the arm by fastening the bundled screw.
3. Fully open the stand before using the monitor. (IEC 62368)
We recommend that you cover the table surface with soft cloth to prevent
damage to the monitor.
Base screw size: M6 x 15 mm.
2.2 Cable management
You can organize the cables with the help of the input/output port cover.
• Arranging the cables
• Using the input/output port cover: the cover can be attached or detached.