EasyManuals Logo
Home>Bernard Controls>Controller>AQL Range

Bernard Controls AQL Range User Manual

Bernard Controls AQL Range
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
English
9
4 ELECTRICAL CONNECTION AND TESTS
To perform the electrical wiring, please refer to the wiring diagram
stuck inside the actuator cover and follow the numbering of the
terminals.
!
Make sure not to wire an AC supply on terminals A, B, C
or a DC supply on terminals 1, 2, 3, this would damage
the board.
4.1 Checking after wiring
Once the wiring of the actuator is completed, please check the
following:
Make sure that the power supply voltage matches the
information on the sticker located on the side of the actuator.
Check that all connectors or cable glands are correctly tightened.
Electrically operate the opening and closing travels and check
that the actuator rotates in the right direction and stops at the
desired position.
If any fault is detected at this stage, please check that your wiring
is correct.


Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bernard Controls AQL Range and is the answer not in the manual?

Bernard Controls AQL Range Specifications

General IconGeneral
BrandBernard Controls
ModelAQL Range
CategoryController
LanguageEnglish

Related product manuals