Contents
ii
Cisco IE 3000 Switch Hardware Installation Guide
AC-Input Power Supply (Optional) 1-21
Management Options 1-22
Network Configurations 1-23
CHAPTER
2 Switch Installation 2-1
Preparing for Installation 2-1
Warnings 2-2
Installation Guidelines 2-3
Environment and Enclosure Guidelines: 2-3
Other Guidelines 2-3
Verifying Package Contents 2-5
Adding Modules to the Switch 2-5
Expansion Module Configurations 2-5
Connecting Modules 2-10
Installing or Removing the Compact Flash Memory Card 2-12
Verifying Switch Operation 2-13
Connecting a PC or a Terminal to the Console Port 2-14
Connecting the Protective Ground and DC Power 2-15
Grounding the Switch 2-15
Wiring the DC Power Source 2-18
Attach the Power and Relay Connector to the Switch 2-23
Attaching DC Power to the PoE Expansion Modules 2-23
Running POST 2-25
Applying Power to the Switch 2-25
Verify POST Results 2-25
Disconnect Power 2-26
Installing the Switch 2-26
Installing the Switch on a DIN Rail 2-27
Installing the Switch on the Wall 2-31
Installing the Switch in a Rack 2-33
Removing the Switch from a DIN Rail or a Rack 2-35
Connecting Power and Alarm Circuits 2-36
Wiring the Protective Ground and DC Power 2-36
Wiring the External Alarms 2-37
Connecting Destination Ports 2-40
Connecting to 10/100 and 10/100/1000 Ports 2-40
Installing and Removing SFP Transceivers 2-41
Installing SFP Transceivers into Module Ports 2-42
Removing SFP Transceivers from Module Ports 2-43