The following mechanical commissioning instructions are for liquid fuel pumps and dispensers.
If LPG, CNG, or AdBlue is being dispensed, refer to the specific manuals for these.
Make sure that the electrical commissioning tests have been carried out and the solenoid
operation has been verified before carrying out the following tests.
Ensure the power supply to the dispenser is turned on, and lift the nozzle. Check all the
dispenser fittings, solenoids and pipework for leaks.
Check all bungs have been removed.
Perform test transactions to ensure flow rate is within acceptable ranges and the dispenser is
correctly measuring fuel.
If a preset is required, perform test transactions with presets and ensure they are working
correctly.
Calibrate the unit with the K-Factor (see page 16.)