EasyManuals Logo
Home>Daikin>Air Conditioner>VRV IV

Daikin VRV IV User Manual

Daikin VRV IV
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #139 background imageLoading...
Page #139 background image
23 | Maintenance and service
Installer and user reference guide
139
RXMLQ8 + RXYLQ10~14T7Y1B*
VRV IV system air conditioner
4P543427-1A – 2020.10
23 Maintenance and service
NOTICE
Maintenance MUST be done by an authorized installer or service agent.
We recommend performing maintenance at least once a year. However, applicable
legislation might require shorter maintenance intervals.
NOTICE
Applicable legislation on fluorinated greenhouse gases requires that the refrigerant
charge of the unit is indicated both in weight and CO
2
equivalent.
Formula to calculate the quantity in CO
2
equivalent tonnes: GWP value of the
refrigerant × total refrigerant charge [in kg] / 1000
In this chapter
23.1 Maintenance safety precautions............................................................................................................................................ 139
23.1.1 To prevent electrical hazards................................................................................................................................. 139
23.2 About service mode operation............................................................................................................................................... 140
23.2.1 To use vacuum mode ............................................................................................................................................. 140
23.2.2 To recover refrigerant............................................................................................................................................ 140
23.1 Maintenance safety precautions
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
NOTICE:Risk of electrostatic discharge
Before performing any maintenance or service work, touch a metal part of the unit in
order to eliminate static electricity and to protect the PCB.
23.1.1 To prevent electrical hazards
When performing service to inverter equipment:
1 Do NOT open the electrical component box cover for 10minutes after turning
off the power supply.
2 Measure the voltage between terminals on the terminal block for power
supply with a tester and confirm that the power supply is shut off. In addition,
measure points as shown in the figure, with a tester and confirm that the
voltage of the capacitor in the main circuit is less than 50VDC. If the voltage
measured is still higher than 50 V DC, discharge the capacitors in a safe
manner by using a dedicated capacitor discharge pen to avoid possibility of
sparking.

Table of Contents

Other manuals for Daikin VRV IV

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Daikin VRV IV and is the answer not in the manual?

Daikin VRV IV Specifications

General IconGeneral
BrandDaikin
ModelVRV IV
CategoryAir Conditioner
LanguageEnglish

Related product manuals