3 How to Install
3.1 Pre-installation
3.1.1 Planning the Installation Site
NOTE
Before performing the installation it is important to plan
the installation of the frequency converter. Neglecting this
may result in extra work during and after installation.
Select the best possible operation site by considering the
following (see details on the following pages, and the
respective Design Guides):
•
Ambient operating temperature
•
Installation method
•
How to cool the unit
•
Position of the frequency converter
•
Cable routing
•
Ensure the power source supplies the correct
voltage and necessary current
•
Ensure that the motor current rating is within the
maximum current from the frequency converter
•
If the frequency converter is without built-in
fuses, ensure that the external fuses are rated
correctly.
3.1.2
Receiving the Frequency Converter
When receiving the frequency converter make sure that
the packaging is intact, and be aware of any damage that
might have occurred to the unit during transport. In case
damage has occurred, contact immediately the shipping
company to claim the damage.
3.1.3
Transportation and Unpacking
Before unpacking the frequency converter it is
recommended that it is located as close as possible to the
final installation site.
Remove the box and handle the frequency converter on
the pallet, as long as possible.
3.1.4
Lifting
Always lift the frequency converter in the dedicated lifting
eyes.
Illustration 3.2 Recommended lifting method, frame size F9/F10.