Every 40 Hours
Document ID: OMM-00144-L VUTEk 3r & 5r Series Maintenance Guide 38
The following maintenance tasks must be performed every 40 hours of production.
PPE Items: GLOVES NITRILE DISPOSABLE BOX LARGE
SAFETY GLASSES
Required Items: WIPES 9X9 CLEAN ROOM
ROLL CONDITIONING FLUID
How-to Video:
Directions:
1. Remove any media.
2. Open the printer hood and insert the retaining pins into the LH and RH Pin sockets.
3. Using a lint-free wipe dampened in roll conditioning fluid, thoroughly wipe down all free-fall rollers, Figure 6-1
.
4. Remove the retaining pins after completing tasks.
6.0 Every 40 Hours
6.1 Clean the free-fall rollers.
CLICK TO PLAY
Figure 6-1 Free Fall Rollers