4 friction pads as shown. (The kit may contain extra
Carriage
Bolt
Friction Pad
Thumbscrew
osition the outrigger assembly adjacent to the transport
handle, with the cross braces under the vacuum for a
forward facing boom arm, or behind the vacuum for a
rearward facing boom arm, as shown to the right.
es of each tube clamp around the
transport handle and outrigger tube, and loosely secure
them with a carriage bolt and thumbscrew.
Tube Clamp
Halves
Outrigger
Tube
Transport
Handle
Before tightening the tube clamps, place a small spacer
shim under the carriage bolt heads to space them slightly
Spacer
Shim
Slide the tube clamps as far to the top and bottom as
ve, and tighten the thumbscrews.
Tighten the thumbscrews on the cross br
Forward Facing Boom Arm
Rearward Facing Boom Arm
Slide the included hose clamp o
et of the lower support bracket.
aise the hose clamp to the bottom of the upper sup-
port bracket and tighten the clamp. This prevents the
mast from lifting out of the mast pocket.
Mast Pockets
Hose Clamp