EasyManuals Logo
Home>Hardi>Paint Sprayer>FOAM MARKER Standard

Hardi FOAM MARKER Standard User Manual

Hardi FOAM MARKER Standard
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
11
HARDI
®
FOAM MARKER STANDARD VERSION
1. Locate and drill (2) 11/32” holes for tank mounting bracket by using the
measurements shown in (Fig. 6).
2. Position tank mounting bracket with bottom edge fl ush with the lower
edge of platform. Clamp into position and mark hole location for top
bolts using previously drilled holes in bracket as a template.
Drill (2) 11/32” holes.
3. Install and tighten all bolts.
6.1 HC 650M, 950, 950M, and Twin 650, 950
Fig. 6
6.0 MOUNTING THE TANK BRACKET
2’ (50mm)
7-7/8“ (200mm) - 20 Gallon
5-1/2" (140mm) - 10/15 Gallon

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hardi FOAM MARKER Standard and is the answer not in the manual?

Hardi FOAM MARKER Standard Specifications

General IconGeneral
BrandHardi
ModelFOAM MARKER Standard
CategoryPaint Sprayer
LanguageEnglish

Related product manuals