13
HARDI
®
FOAM MARKER STANDARD VERSION
6.3 Commander 750, 875, 1200 & Twin Force
1. Locate and drill (2) 11/32“ holes in the tank mounting bracket (Fig. 8)
for 20 Gallon tanks, (Fig. 10) for 10/15 Gallon tanks.
2. Position tank mounting bracket on the outside of the platform according
to (Fig. 9) for 20 Gallon tanks, (Fig. 11) for 10/15 Gallon tanks. Clamp
into position and mark hole location for the remaining bolts using previ-
ously drilled holes in bracket as a template. Drill (2) 11/32“ holes.
3. Install and tighten all bolts.
Fig. 8
20 gallon Tank Mounting Bracket
Note: Twin Force only! If the
Hydraulic Flow Valve
(mounted underneath the
platform) needs to be moved,
a bracket (#161379) is
required.
Fig. 9
20 gallon Tank Mount Bracket
Installation