5-12
1. Level the bucket with the surface of the ground. Pen-
etrate the bucket into the accumulated soil while driving
the machine forward.
2. After the bucket has sufficiently penetrated the soil, raise
the lift arm while driving the machine forward further
and occasionally tilt the bucket back to fill the bucket.
3. If it is difficult to penetrate the soil with the bucket, move
the bucket back and forth and the bucket teeth up and
down.
4. Drive the machine with the bucket tilted backward fully
and held at the lowest possible position.
M4GB-05-003
M4GB-05-004
M4GB-05-005
M4GB-05-006