Do not use solvents such as water, alcohol, or oil to clean electrical
components inside or outside of the equipment.
Grounding
Ensure that the grounding impedance of the equipment complies with local
electrical standards.
Ensure that the equipment is connected permanently to the protective
ground. Before operating the equipment, check its electrical connection to
ensure that it is reliably grounded.
Do not work on the equipment in the absence of a properly installed ground
conductor.
Do not damage the ground conductor.
Cabling Requirements
When selecting, installing, and routing cables, follow local safety regulations
and rules.
When routing power cables, ensure that there is no coiling or twisting. Do not
join or weld power cables. If necessary, use a longer cable.
Ensure that all cables are properly connected and insulated, and meet
specications.
Ensure that the slots and holes for routing cables are free from sharp edges,
and that the positions where cables are routed through pipes or cable holes
are equipped with cushion materials to prevent the cables from being
damaged by sharp edges or burrs.
Ensure that cables of the same type are bound together neatly and straight
and that the cable sheath is intact. When routing cables of
dierent types,
ensure that they are away from each other without entanglement and
overlapping.
Secure buried cables using cable supports and cable clips. Ensure that the
cables in the
backll area are in close contact with the ground to prevent
cable deformation or damage during
backlling.
If the external conditions (such as the cable layout or ambient temperature)
change, verify the cable usage in accordance with the IEC-60364-5-52 or local
laws and regulations. For example, check that the current-carrying capacity
meets requirements.
When routing cables, reserve at least 30 mm clearance between the cables
and heat-generating components or areas. This prevents deterioration or
damage to the cable insulation layer.
1.3 Environment Requirements
D ANGER
Do not expose the equipment to ammable or explosive gas or smoke. Do not
perform any operation on the equipment in such environments.
SUN2000-(8KTL-20KTL)-M2
User Manual 1 Safety Information
Issue 11 (2023-02-07) Copyright © Huawei Technologies Co., Ltd. 6

Table of Contents

Other manuals for Huawei SUN2000-8KTL-M0

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-8KTL-M0 and is the answer not in the manual?

Huawei SUN2000-8KTL-M0 Specifications

General IconGeneral
BrandHuawei
ModelSUN2000-8KTL-M0
CategoryInverter
LanguageEnglish

Related product manuals