7.1.3 Creating a PV Plant and a User
Figure 7-5 Creating a PV plant and a user
● In the quick settings, the grid code is set to N/A by default (automatic startup is not
supported). Set the grid code based on the area where the PV plant is located.
● For details about how to use the site deployment wizard, see
FusionSolar App Quick
Guide
. You can scan the QR code to download the quick guide.
7.1.4 (Optional) Setting the Physical Layout of the Smart PV
Optimizers
● If smart PV optimizers are congured for PV strings, ensure that the smart PV
optimizers have been successfully connected to the SUN2000 before performing the
operations in this section.
● Check that the SN labels of smart PV optimizers are correctly attached to the physical
layout template.
● Take and save a photo of the physical layout template. Keep your phone parallel to the
template and take a photo in landscape mode. Ensure that the four positioning points in
the corners are in the frame. Ensure that each QR code is attached within the frame.
● For details about the physical layout of smart PV optimizers, see
FusionSolar App
Quick Guide
. You can scan the QR code to download the quick guide.
SUN2000-(8KTL-20KTL)-M2
User Manual 7 Man-Machine Interaction
Issue 11 (2023-02-07) Copyright © Huawei Technologies Co., Ltd. 79