72 Implementing the IBM Storwize V5000 Gen2 with IBM Spectrum Virtualize V8.1
2. If the enclosure is cabled correctly, the wizard identifies the candidate expansion
enclosure. Select the expansion enclosure and click Next, as shown in Figure 2-45.
Figure 2-45 Expansion enclosure cable check
3. Select the expansion enclosure and click Actions → Identify to turn on the identify LEDs
of the new enclosure, if required. Otherwise, click Next.