Table 5. Steps for different installation scenarios for Storwize V5000 Gen2 systems (continued)
New system Existing system
Control enclosure only Control enclosure and one
or more expansion
enclosures
Adding expansion
enclosures
Adding a control enclosure
and expansion enclosures (
Storwize V5030 only)
“Connecting Fibre Channel
cables to a Fibre Channel
host interface adapter” on
page 150
“Connecting Fibre Channel
cables to a 10 Gbps
iSCSI-FCoE 4-port host
interface adapter” on page
148
“Connecting Ethernet
cables to node canisters” on
page 144
“Powering on the system”
on page 153
1
“Connecting Ethernet
cables to node canisters” on
page 144
2
“Powering on the system”
on page 153
“Connecting Ethernet
cables to node canisters” on
page 144
“Adding an expansion
enclosure to an existing
system” on page 162
“Connecting Fibre Channel
cables to a Fibre Channel
host interface adapter” on
page 150
Chapter 3, “Configuring the
system,” on page 157
“Powering on the system”
on page 153
“Powering on the system”
on page 153
Chapter 3, “Configuring the
system,” on page 157
“Adding a control
enclosure to an existing
Storwize V5030 system” on
page 162
1
Complete these steps for each expansion enclosure that you add.
2
Complete these steps for each control enclosure and expansion enclosure that you add.
Be familiar with the following information
v See “Caution notices for the system” on page x and “Danger notices for the
system” on page xiv for a summary of the situations that can be potentially
hazardous to you. Before installing, read and understand the following caution
and danger statements.
v Use safe practices when lifting. The fully populated enclosure weighs about 26
kg (57 lbs). At least two people are required to lift and install the enclosure into
the rack or to remove an enclosure from the rack.The fully populated enclosure
weighs about 37 kg (82 lbs). At least three people are required to lift and install
the enclosure into the rack or to remove an enclosure from the rack.
CAUTION:
Use safe practices when lifting.
svc00146
18-32 kg (39.7-70.5 lbs) 32-55 kg (70.5-121.2 lbs)
55 kg ( 121.2 lbs)
(27)
Also keep in mind that a rack full of equipment is extremely heavy.
DANGER: Heavy equipment–personal injury or equipment damage might
result if mishandled. (D006)
2 Storwize V5000 Gen2: Quick Installation Guide

Table of Contents

Other manuals for IBM Storwize V5030

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storwize V5030 and is the answer not in the manual?

IBM Storwize V5030 Specifications

General IconGeneral
BrandIBM
ModelStorwize V5030
CategoryStorage
LanguageEnglish

Related product manuals