SERVICING
Esprit - Installation and Servicing
79
PUMP HEAD REPLACEMENT
1. Refer to Frame 52.
2. Drain the boiler CH circuit. Refer to Frame 72.
3. Swing the control box down into the servicing
position. Refer to Frame 46.
4. Disconnect the electrical lead from the pump.
5. Remove the 4 Allen screws retaining the pump
head.
6. Remove the pump head.
7. Fit the new pump head.
8. Reassemble in reverse order.
9. Refill the boiler. Refer to Frame 32.
10. Check operation of the boiler. Refer to Frame 52.
78
DHW PLATE HEAT EXCHANGER REPLACEMENT
1. Refer to Frame 52.
2. Swing the control box down into the
servicing position. Refer to Frame 46.
3. Drain the boiler. Refer to Frame 72.
4. Remove divertor valve actuator. Refer to
Frame 62.
5. Remove gas valve. Refer to Frame 61.
6. Remove the 2 allen screws securing the
plate heat exchanger to the brass
housings.
7. Manoeuvre the plate heat exchanger out of
the boiler.
8. Fit the new plate heat exchanger, using the
new o-rings supplied.
9. Reassemble in reverse order.
10. Refill the boiler. Refer to Frame 32.
11. Check operation of the boiler. Refer to
Frame 52.
66 7
5
4
4
SERVICING

Other manuals for IDEAL he24

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL he24 and is the answer not in the manual?

IDEAL he24 Specifications

General IconGeneral
BrandIDEAL
Modelhe24
CategoryBoiler
LanguageEnglish

Related product manuals