EasyManuals Logo
Home>Kohler>Engine>Command PRO CV682

Kohler Command PRO CV682 Service Manual

Kohler Command PRO CV682
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
Lubrication System
2924 690 37 Rev. B KohlerEngines.com
OIL SENTRY
(if equipped)
This switch is designed to prevent engine from starting
in a low oil or no oil condition. Oil Sentry
may not shut
down a running engine before damage occurs. In some
applications this switch may activate a warning signal.
Read your equipment manuals for more information.
Oil Sentry
pressure switch is installed in breather cover.
On engines not equipped with Oil Sentry
installation
hole is sealed with a 1/8-27 N.P.T.F. pipe plug.
Installation
1. Apply pipe sealant with Teon
®
(Loctite
®
PST
®
592™
Thread Sealant or equivalent) to threads of switch.
2. Install switch into tapped hole in breather cover.
3. Torque switch to 4.5 N·m (40 in. lb.).
Testing
Compressed air, a pressure regulator, pressure gauge,
and a continuity tester are required to test switch.
Normally Closed Switch
1. Connect continuity tester across blade terminal and
metal case of switch. With 0 psi pressure applied to
switch, tester should indicate continuity (switch
closed).
2. Gradually increase pressure to switch. As pressure
increases through range of 2-5 psi, tester should
indicate a change to no continuity (switch open).
Switch should remain open as pressure is increased
to 90 psi maximum.
3. Gradually decrease pressure through range of 2-5
psi. Tester should indicate a change to continuity
(switch closed) down to 0 psi.
4. Replace switch if it does not operate as specied.
Normally Open Switch
1. Connect continuity tester across blade terminal and
metal case of switch. With 0 psi pressure applied to
switch, tester should indicate no continuity (switch
open).
2. Gradually increase pressure to switch. As pressure
increases through range of 2-5 psi, tester should
indicate a change to continuity (switch closed).
Switch should remain closed as pressure is
increased to 90 psi maximum.
3. Gradually decrease pressure through range of 2-5
psi. Tester should indicate a change to no continuity
(switch open) down to 0 psi.
4. Replace switch if it does not operate as specied.

Other manuals for Kohler Command PRO CV682

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler Command PRO CV682 and is the answer not in the manual?

Kohler Command PRO CV682 Specifications

General IconGeneral
BrandKohler
ModelCommand PRO CV682
CategoryEngine
LanguageEnglish

Related product manuals