4
3. Installation of the machine and steps to be
performed before operationSecurity Function Ver. 1.01 Feb. 2017
5. Select the function to be used as follows: [Forward] → [Detail Settings] → [PING Confir-
mation], and make the operation check of TCP/IP.
After completing all the steps, take a sample copy, and confirm the image. If image
troubles occur, first turn OFF and ON the Main Power Switch, and then redo the
steps from “Date & Time Setting/Time Zone Setting” to “Unit change.”
3.1.15 Affixing the paper size label
1. Affix the paper size labels that correspond to the sizes of paper used in each tray.
3.1.16 Installing the user’s guide holder
1. Install the user’s guide holder. When the user’s guide holder is installed to the rear of
the main body, the optional Clean Unit CU-101 cannot be installed at the same time.
3.1.17 Affixing the panel sheet
1. Affix the supplied panel sheet to the surface of the operation panel. The panel sheet is
affixed on customer request. The panel sheet must be kept by the customer.