EasyManuals Logo
Home>Lenze>Controller>c550

Lenze c550 User Manual

Lenze c550
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background image
8.1.3 Commissioning
The EtherCAT master enables the control of the subordinate EtherCAT device. Connected
EtherCAT slaves can be congured in this way using the engineering PC.
Precondions
The eld devices are installed as per the informaon in the device-specic mounng
instrucons.
The commissioning of the controller is completed.
Recommended sequence of the commissioning steps
1.
Use the Online Login menu command or the <Alt> + <F11> keys to log into the controller.
2.
4Determine the physical EtherCAT conguraon (network scan) ^ 42
3.
Adapt the network conguraon.
4.
4Edit EtherCAT I/O mapping ^ 45
5.
Use the Build Compile menu command or the <F11> funcon key to compile the program
code.
6.
Use the Online Login menu command or the <Alt> + <F11> keys to load the conguraon.
7.
Use the Debug Start menu command or the <F5> funcon key to start the PLC program.
Conguring the network
EtherCAT
Commissioning
41

Table of Contents

Other manuals for Lenze c550

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lenze c550 and is the answer not in the manual?

Lenze c550 Specifications

General IconGeneral
BrandLenze
Modelc550
CategoryController
LanguageEnglish

Related product manuals