TRAINING MANUAL
DLEX8377WM
DLEX8388WM
Page 11
STEAM DRYER
INSTALLATION (Stacking Kit) continued
Install the front rail of the stacking kit. Push
the front rail back against the stops on the
side brackets.
Insert a screw to attach the front rail to the
side bracket.
Insert the other screw for the other side.
INSTALLATION (Makeup Air)
Minimum clearances must be observed, particularly if the dryer is installed in a closet or a
laundry alcove. The dryer is essentially an air pump moving 150 cfm (cubic feet per
minute) and that air must come from somewhere for the dryer to operate properly.
Additional air must be supplied to support proper combustion.