EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 4100L-1

Manitowoc Grove GMK 4100L-1 User Manual

Manitowoc Grove GMK 4100L-1
356 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
Maintenance overview
5.1 Maintenance intervals
5 - 2 3 302 364 en Maintenance manual
GMK 4100L-1
25.11.2016
The maintenance interval which occurs first determines when the next
maintenance is due.
–The driven km (or mi) can be taken from the speedometer.
– You can individually call up the Operating hours (oper. hrs.)
of the engine
and power units on the
CCS display.
The following table sets out the maintenance intervals for the maintenance
plans:
Please note that the long-term maintenance plans always include the
short-term ones.
Maintenance
plans
Maintenance
interval
Driven km (mi)
(carrier)
Engine operating
hours (o
per. hrs.)
D
daily/before
putting int
o
ope
ration
— —
W Weekly — —
M 1 monthly
approx. 2,000
(ap
p
rox. 1,240)
approx. 100
M 3
every three
months
5,000 – 6,000
(3,100
– 3,7
30)
250
M 6
every six
months
10,000 – 12,500
(6,210
– 7,7
70)
500
M 12 every 12 months
20,000 – 25,000
(1
2,430
– 15,530)
1,000
Y 2 every 24 months
40,000 – 50,000
(2
5,000
– 31,000)
2,000
Y 3 every 36 months — 3,000
Y 5 every 60 months
100,000
(62,00
0)
5,000
Y 6 every 72
months — 6,000
Y 10
every 120
months
200,000
(124,0
00)
12,000

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 4100L-1 and is the answer not in the manual?

Manitowoc Grove GMK 4100L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 4100L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals