Maintenance overview
5.1 Maintenance intervals
25.11.2016
Maintenance manual 3 302 364 en 5 - 1
GMK 4100L-1
5 Maintenance overview
– Maintenance plans D (= daily),
– Maintenance plans W (= weekly) and
– Maintenance plans M 1 (=
once
a month) to M 12 (= every 12 months) and
– Maintenance plans Y 2 (= every 24
months) to Y 10 (= every 120 months).
The maintenance plans are given in table form, divided into
– Maintenance work on the carrier and
– Maintenance work on the supers
tructure.
In the tables, cross references direct you to the sections in which the
appropriate maintenance work is described. The cross references consist of
the chapter number and the corresponding page number, e.g.
Check hydraulic oil level;
à p. 7 - 97.
Checking the hydraulic oil level is described in Chapter 7, the section starts
on page 7 - 97.
5.1 Maintenance intervals
The length of the maintenance interval depends on the grade of oil used and
operating conditions of the truck crane.
The next maintenance must be carried out after
– a specified time (maintenance interval) or
– a specified number of km driven
(mi) or
– a specified number of operating
hours (oper. hrs.) or
–an indication on the
CCS display in the driver's cab; Ã p. 7 - 11 or
–an indicati
on on the CCS display in the crane cab; Ã p. 8 - 7.
s