Manitowoc Published 08-06-19, Control # 237-09_v2 4-23
MLC165-1 OPERATOR MANUAL SETUP AND INSTALLATION
Install First Crawler
1. Do not raise the mast past vertical (90°), Figure 4-18, or
it will interfere with crawler installation.
NOTE Two crawler assemblies are provided: right side
and left side.
The hydraulic hoses on the drive end of the
crawlers must be positioned adjacent to the
hydraulic hoses on the rear of the carbody.
2. Attach a 3-leg chain sling (Figure 4-19
) — or shackles
and synthetic slings — from the assist crane to the three
lifting lugs on the crawler. The crawler weighs
approximately 33,000 lb (14 969 kg).
3. Lift the crawler clear of the trailer using the assist crane.
The crawler will hang slightly out of level toward the
crane.
4. Remove the trailer.
5. Lift the crawler into position at the carbody (Figure 4-20
)
Figure 4-20
Item Description
1 Collar Stored
2 Crawler Pin (2)
3 Alignment Pin (2)
4 Alignment Saddle (2)
5 Connecting Hole (2)
DISENGAGED
STORED