INTRODUCTION MLC165-1 OPERATOR MANUAL
1-2
Published 08-06-19, Control # 237-09
IDENTIFICATION AND LOCATION OF COMPONENTS
Item Description
1 Lowerworks
2 Upperworks
3 Boom Butt
4 Boom Stop (physical)
5 Boom Butt Wire Rope Guide
6 Drum 3 (luffing hoist or auxiliary)
7 Insert: 6 m (19.7 ft) with Sheaves
8 Guide Sheaves (in insert)
9 Load Lines
10 Insert: 3 m (9.8 ft)
11 Insert: 6 m (19.7 ft)
12 Boom Straps
13 Insert: 12 m (39.4 ft)
14 Load Block
15 Weight Ball
16 Boom Top
17 Boom Top Wire Rope Guide
18 Lower Boom Point
19 Upper Boom Point
20 Fixed Jib
Figure 1-3. Identification and Location of Components
42m (137.8 ft) boom shown
2
1
9
8
13
12
14
15
16
19
17
11
10
7
3
6
page 1-3
4
5
20
18

Table of Contents

Other manuals for Manitowoc MLC165-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC165-1 and is the answer not in the manual?

Manitowoc MLC165-1 Specifications

General IconGeneral
BrandManitowoc
ModelMLC165-1
CategoryConstruction Equipment
LanguageEnglish