Manitowoc Published 08-06-19, Control # 237-09_v2 4-89
MLC165-1 OPERATOR MANUAL SETUP AND INSTALLATION
4
19.7 ft (6 m) Insert with Sheaves
19.7 ft (6 m) Insert without Sheaves,
but with Sheave Frames
19.7 ft (6 m) Insert
9.8 ft (3 m) Insert
39.4 ft (12 m) Insert
Boom Top
Boom Butt in Shipping Position
with Auxiliary Drum
Boom Butt in Woring Position
without Auxiliary Drum
Center of Gravity
Symbol
Figure 4-65
Boom Butt in Working Position
with Auxiliary Drum
Boom Butt in Shipping Position
without Auxiliary Drum

Table of Contents

Other manuals for Manitowoc MLC165-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC165-1 and is the answer not in the manual?

Manitowoc MLC165-1 Specifications

General IconGeneral
BrandManitowoc
ModelMLC165-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals