28
8.4 ECB REPLACEMENT – CONTINUED
CHAPTER 8: PART REPLACEMENT GUIDE
FIGURE E FIGURE F
FIGURE G FIGURE H
7) Remove the 6 bolts holding the ECB to the frame & remove the belt once loosened (Figure E).
8) Remove the old ECB and install the new ECB from the user’s left side of the frame. (Figure F).
9) Install the 6 frame mounting bolts loosely & attach the belt. (Figure G).
10) Attach the tension loop bolt to the ECB bracket and tension the belt to 120 lbs using an 11mm nut (Figure H).
11) Tighten the 6 frame mounting bolts to 12 N-m torque.
12) Reconnect the ECB wires, reassemble the front disks and shrouds.
13) Test the Ascent Trainer as outlined in Section 9.19. .