5
Safety
Precautions
Installation
Requirements
Installation
Instructions
INSTALLATION REQUIREMENTS
TOOLS AND PARTS
Gather the required tools and parts before starting installation.
PARTS SUPPLIED
Flat-head Wood
Screws (4)
Top-mounting Clips (2)
Screw-type Hose Clamp Drain Hose
PARTS NEEDED (NOT PROVIDED)
Thread Seal Tape UL Listed Wire Nuts (3)
Power Supply Cord Kit
# B K 500 or
Electric Cable (Optional)
Copper Tubing Water
Line (
" min.)
Hose Clamps
Strain Relief
compression 90 ELbow
(if not included in in hose kit)
3/4" FHT x 3/8" OD