EasyManuals Logo
Home>Nexo>Stereo System>GEOM1210-I

Nexo GEOM1210-I System Manual

Nexo GEOM1210-I
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #62 background imageLoading...
Page #62 background image
Page 62/90 GEO M12 HARDWARE SETUP PROCEDURE
- Once last GEO M12 has been removed, unlock and remove bottom bumper
- Lower MSUB18s on the ground, unlock front and rear rigging points and lift cluster to remove bottom
MSUB18.
- Repeat until last MSUB18 is removed
- Disassemble top bumper.
6.5 Permanent Installation variant
All procedures described above apply to installation versions, with the exception of bumper and cabinet
connections, which are described below:
Configuring VNI- BUMPM12 for GEO M12-I Left or Right
- Adjust the front rigging point to required configuration and lock with provided screws (screws M8x45,
washers M8, brake nuts M8).

Table of Contents

Other manuals for Nexo GEOM1210-I

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nexo GEOM1210-I and is the answer not in the manual?

Nexo GEOM1210-I Specifications

General IconGeneral
BrandNexo
ModelGEOM1210-I
CategoryStereo System
LanguageEnglish

Related product manuals