6 - 89
6 Programless Communications
E5@C Digital Temperature Controllers Communications Manual (H175)
6-11 Connecting to Keyence KV-series PLCs
6
6-11-4 E5@C Controller Setup
Set up programless communications. Perform the procedure that is given in 6-4-4 E5
@
C Controller
Setup.
The SP and RUN/STOP status of the E5@C Controllers will be changed to check operation. Make sure
that this will not create any problems in the controlled system.
Checking E5CC Monitor Values
(1) Place the PLC into Monitor Mode.
Select Monitor Mode from the Monitor/Simulator Menu on the KV STUDIO.
(2) The PLC Memory Dialog Box will be displayed.
Select Batch Monitor Mode from the Monitor/Simulator Menu on the KV STUDIO.
(3) Change the display format to make the values easier to check.
Select the first display format and change it to Signed decimal 16 bits.
(4) We will check the E5CC monitor values.
The area where monitor values are checked is called the upload area.
DM0 to DM14 is the upload area for the No. 0 Controller, DM30 to DM44 is the upload area
for the No. 1 Controller, and DM60 to DM74 is the upload area for the No. 2 Controller.
6-11-4 E5@C Controller Setup
6-11-5 Checking Operation