4 | Linear ue installation guide 13541-A 01-20
General ueing guidelines
Flue clearances to
combustibles
Due to the heat from the ue components, maintain a 25 mm
clearance to combustibles for the rst 500 mm of ue.
Flashings Flashings are not included with the ue kits, these must be
specied.
Flue support The weight of the ue system must not be supported by the
appliance, it must be self-supporting. Supporting the ue is
usually completed during the framing stage with ue supports
or straps within the cavity. Wall straps are included with most
Rinnai ue components.
Securing the ue To prevent the ue from moving or coming apart:
• Joints between the ue components MUST BE secured by
short screws
1
(max. length 6 mm) through the outer pipes
(easier to undo if necessary).
• Flue components must be secured to the wall using the ue
straps provided in each ue kit, refer image above.
Lubricate o-ring seals
before connecting
The inner pipe joints are sealed with an o-ring seal lubricant. A
small plastic tub of silicone grease is provided with the main ue
kits. Use this silicone grease to lubricate the o-rings on the inner
pipes prior to assembly. This is important as o-rings can dry out
and break, and replacing o-rings is dicult.
Do not use petroleum based lubricants as these will cause
deterioration of the o-ring seals.
Flue sections located
outside
Sections of the ue located outside require the following:
• Only use PVC cement between the joints of the outer PVC
pipes to secure and seal the joints against ingress of dust
and water.
• Only use non-acidic silicone sealant between the joints of
the outer PVC pipe and any mating aluminium components
to seal the joints against ingress of dust and water. Silicone
containing acetic acid or other acids as the curing agent may
cause the aluminium to corrode.
Shared ues Gas appliances must not be connected to a chimney or ue
serving a separate ue burning appliance.
Condensate A condensate trap or drain is not required for Linear installations
as little or no condensate is produced, as the ue runs hotter in
Linear installations.
1
Screws must not touch the inner pipe—could cause a transfer of heat to the plastic outer and potentially
melt the plastic.