C. Pipeline installation (F116Q3 as example)
① Install control valve
a. As the Figure 1-1 shows, select the riser pipe with 26.7mm OD, glue
the riser pipe to the bottom strainer and put it into the mineral tank, cut
off the exceeding tube out of tank top opening. Plug the riser tube in case
of mineral entering.
b. Fill a stipulated amount of resin to the tank.
c. Screw the top strainer into the control valve.
d. Insert the riser tube into control valve and screw tight control valve.