MODEL:F67Q/F71Q/F68Q/F69Q/F116Q/F117Q
23
C. Usage
After the accomplishment of installation, parameter setting and trial
running by the professional, the valve can be put into use. In order to ensure
that the quality of outlet water can reach the requirements, the user should
complete the below work:
① Add the salt for regeneration in time to ensure the solid salt is always
available in brine tank. Only clean softening salt can be added to the brine tank,
at least 99.5% pure. It is forbidden to use fine salt and iodized salt.
② Test the outlet water and raw water hardness at regular intervals. When the
outlet water hardness is unqualified, please press the and the valve will
temporarily regenerate again (It will not affect the original set operation cycle)
③ When the feed water hardness changes a lot, you can adjust the water
treatment capacity as below:
Press and hold both and for 5 seconds to unlock the buttons.
Press , the third decimal point of digital tube lights on, then press to
choose the water treatment capacity, the digital area will show the given water
treatment capacity, such as 10.00m
3
. Press again, the water treatment
capacity “10.00” flashes, then press to reset the value. Press twice
and hear a sound “Di”, the adjustment finished. Press exit and turn back to
the service status.
④ For A-01 control mode (Delayed regeneration type), please pay attention
whether the time is current or not. If the time is not right, you can adjust as
below: After unlocking the buttons, press , the third decimal point of digital
tube lights on. Then press , the ":" and hour value flash. Press or
continuously to reset the hour value; Press again, ":" and minute value
flash. Press or continuously, reset the minute value; Press and hear
a sound “Di”, the adjustment finished. Press exit and turn back to the
service status.
The regeneration parameters have been set when control valve left the
factory. Generally, it does not need resetting. If you want to inquire and