EasyManuals Logo
Home>Runxin>Control Unit>F116Q3

Runxin F116Q3 User Manual

Default Icon
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
MODELF67Q/F71Q/F68Q/F69Q/F116Q/F117Q
16
brine tube.
b. Insert tube bushing into the end of brine tube.
c. Tighten nut onto brine line connector.
d. Connect the other end of brine tube with the brine tank. (The liquid
level controller and air-blocker should be installed in the brine tank.)
Remark: The brine tube and drain pipeline should not be bended or
plugged.
2. Basic Setting & Usage
2.1. The Function of PC Board
Take time clock type valves F67Q1/F68Q1/F116Q1 and meter type
valves F67Q3/F68Q3/F116Q3 as example:

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Runxin F116Q3 and is the answer not in the manual?

Runxin F116Q3 Specifications

General IconGeneral
BrandRunxin
ModelF116Q3
CategoryControl Unit
LanguageEnglish

Related product manuals