MAINTENANCE MANUAL
STEMME TSA-M
MAINTENANCE MANUAL
STEMME TSA-M
05-10-00
Page 01
NOTES:
(1) The stated times are provisional within the TBO development program. Based on sufficient
operating experience they may be further raised or reduced if necessary (extension of TBO
TIME LIMITS
1. General
A. This section contains part manufacturer recommended time limits for replacement and overhaul
of parts.
2. Replacement and Overhaul Schedule
A. The following parts or components must be replaced or overhauled at the specified intervals.
Under specific circumstances the replacement/overhaul of parts or components may be required
before attaining the time limits as listed below.
B. On expiry of a part's permissible operating times the affected part has to be sent to the
manufacturer or to a from the manufacturer approved repair/overhaul workshop for inspection.
The organisation has to decide if further use is possible after the inspection, or if an replacement
or overhaul or repair is necessary.
If the limitation is given in operating hours and in a calendar period (year), the first occurring case
applies.
If further equipment subject to service life limitations is installed, the overhaul intervals and
service life limits prescribed by the respective manufacturer must be observed. The item has to be
entered in the form Review of Operating times.
C. Replacement and Overhaul Schedule
Cha. Component Manufacturer/ P/N Permissible operating Note
Type (STEMME) time by
Overhaul Replacement
71 Rotax Engine ROTAX 914F 830.400 refer to - (2)(3)
note (3)
61 Constant Speed MT-Propeller 830.044 refer to - (1)(2)(4)
Propeller MTV 7A/170-51 note (4)
71 Rubber parts ROTAX refer to IPC - 5 years (6)
of engine ROTAX 914F
25 Seat belt various 835.000 - 12 years (5)
835.001
53 Tow Release Tost, E22 830.693 refer to - (7)
(Option) note (7)
May 04/12