Page 25
POWERING TECHNOLOGY
Manual No. MS0027-MAN rev. 4
guardian_access_3u_ms27-man-rev4-0817.indd
To mount the system into an open frame, follow the steps below:
1. Determine the installation position according to system measurement. Refer to the
Appendix A for details.
2. Remove the mounting brackets on the front left and right side of the system.
3. Rex the mounting brackets to the middle left and right side of the system.
4. Place the system into the open frame.
5. Fasten the system to the open frame by using four M6 x 12mm screws and the mounting
brackets. Tighten the screws to 6 Nm.
Figure 4-2 System Mounting - Open frame / relay rack