InstallationInstallation
1. Positioning
2. Preliminary activities
3. Electric power supply
4. Checking the electric connections
5. Gas units – gas supply connection
6. Water inlet: STEAM.Maxi™
7. Water outlet
8. Exhausts
9. Rotor.Klean
10. MAXI.Link – Stacking two or three ovens
11. MAXI.Link – Connecting ovens to accessories
12. Unox condensation hood
13. Unox reverse osmosis
14. Door Inversion
15. Hidden menu (Series 4)
16. Hidden menu (Series 5)