EMR3 Truck Installation Installation Procedures - Fuel Oil Truck Application
14
SMITH FLOW METER INSTALLATION
Table 4 lists the parts included in the EMR
3
approved adaptor kit. In addition to “Installation Procedure” on page 6,
see Figure 10 on page 15, Figure 11 and Figure 12 on page 16, and Figure 13 on page 17 for instructions on
how to disassemble then reassemble the calibrator.
Table 4.- Display Head-to-Smith Meter Adaptor Kit 846000-005
Item Qty V-R P/N
Wire - Sealing 24” (610 mm) LG 1 011853-285
Coupling - Slot 0.130 W 1 065004-005
Screw - 0.250-28 x 0.62 Hex 4 503615-001
Lockwasher - 0.256 x 0.02 4 510003-006
Groove Pin - 0.078 D x 0.562 1 510114-001
Groove Pin - 0.063 D x 0.781 1 510105-177
Group - Short Shaft 1 331433-001
Group - Long Shaft 1 331433-002

Table of Contents

Other manuals for Veeder-Root EMR3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Veeder-Root EMR3 and is the answer not in the manual?

Veeder-Root EMR3 Specifications

General IconGeneral
BrandVeeder-Root
ModelEMR3
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals